www.rkvl.cn-性少妇mdms丰满hdfilm,亚洲精品专区在线观看,国产亚洲成人av一级特黄高清aaaa大片,久久久久久中文字幕无码

<cite id="imm82"><abbr id="imm82"></abbr></cite>
  • <strike id="imm82"><rt id="imm82"></rt></strike>
    • Language:CHINESESENGLISH

      Home > News > construction steel structure fire regulations
      CONTACT US
      • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
      • Phone:0757-81002668/0757-63323396
      • Fax:0757-81196682
      • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
      • E-mail:sbs@sbsprefabhouse.com
      • URL:http://www.rkvl.cn

      construction steel structure fire regulations

      Time:[2016-1-27]  Hits:4214

      Guangzhou Steel tells you: construction steel structure fire regulations


      1. Guangzhou fireproof coating protected by trained and qualified construction professional construction team. Construction of security technology and labor protection requirements, should be the existing relevant provisions of the state.
      2. When the steel structure in place, the boom connected thereto, a horse track, pipe racks and other related components even installed, and after passing the acceptance, before proceeding fireproof coating.
      3. Before construction, steel surfaces should be rust, and determine in accordance with the requirements of anti-rust treatment. Rust and rust treatment should comply with "Steel Construction and acceptance norms" in the relevant provisions.
      4. steel surface debris should be cleaned, cracks or other fire use fire-resistant coating material which is connected at the block level before construction fill.
      5. fire retardant coating construction should be carried out before the next interior decoration and are not damaged by the subsequent engineering conditions. When construction on the site and other objects need for fire protection shielding should be protected, just construction coating should prevent dirty fluid contamination and mechanical shocks.
      6. Before the construction process and the coating is dried and solidified, the ambient temperature should be maintained at 5 ~ 38 ℃, relative humidity not more than 90%, the air should circulate. When the wind speed is greater than 5m / s, or rain and member surface condensation, not a job.

      Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
      免费a级毛片无码久久| 99riav9精品香蕉免费大视频| 中文字幕日韩一区二区三区不卡| 亚洲成a人片在线观看久| 欧美日韩精品一区二区视频| 伦理电影在线| 青草青草久热精品视| 中文字幕亚洲综合久久菠萝蜜| 少妇厨房愉情理伦BD在线观看| 好日子在线观看视频大全免费|