www.rkvl.cn-性少妇mdms丰满hdfilm,亚洲精品专区在线观看,国产亚洲成人av一级特黄高清aaaa大片,久久久久久中文字幕无码

<cite id="imm82"><abbr id="imm82"></abbr></cite>
  • <strike id="imm82"><rt id="imm82"></rt></strike>
    • Language:CHINESESENGLISH

      Home > News > Guangzhou Steel teach you: connection handling, processing and Steel Works conflict face pieces
      CONTACT US
      • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
      • Phone:0757-81002668/0757-63323396
      • Fax:0757-81196682
      • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
      • E-mail:sbs@sbsprefabhouse.com
      • URL:http://www.rkvl.cn

      Guangzhou Steel teach you: connection handling, processing and Steel Works conflict face pieces

      Time:[2015-8-1]  Hits:4892

      Guangzhou Steel teach you: connection handling, processing and Steel Works conflict face pieces


      1, the connector bolt hole according to relevant provisions of Chapter 8 of this specification for processing, precision bolt hole wall roughness appearance, diameter and pitch tolerance and so on, Guangzhou steel should be consistent with existing national standards "Steel Construction Quality Acceptance "of the relevant provisions of GB50205.
      2, bolt hole pitch over the provisions of this Code section 7.2.1 of the allowable error, the base material can be used to match the welding electrodes, and shall be subject to the system after re-qualified NDT holes, each hole by welding Number of re-drilling must not exceed 20% of the group the number of bolts.
      3, high strength bolts conflict face contact surface voids due to the thickness tolerances and other manufacturing error or installation error occurs, provisions for processing in accordance with Table 7.2.3.
      4, conflict bolts connecting surface treatment process can be selected at the design according to the requirements of the anti-slip coefficient, anti-slip coefficient should fit the design requirements. When using hand-grinding wheel, grinding direction should be perpendicular to the direction of the force and scope should not be less than 4 times grinding bolt aperture.
      5, the high strength bolts connecting process after the appearance of a conflict surfaces, should be consistent with the following provisions:
      (1) a connection collision surface should be dry and clean, should not have flash, burrs, weld spatter, burr, iron skin, dirt and so on;
      (2) Conflict surface after treatment should take protective measures, shall be marked in conflict face;
      (3) Conflict surface with rust treatment, before installation should be fine wire brush perpendicular to the direction of the force member removed rust conflicts surface. Guangzhou Steel

      Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
      性欧美丰满的P| 国产亚洲Av综合人人澡精品| 日产精品卡二卡三卡四卡区满十八| 国产成人精欧美精品视频| 最好看在线观看视频| 国产免费无码一区二区视频| 国产精品视频全国免费观看| 久久精品国产亚洲AV不卡| 潘金莲书房双乳晃动干柴烈火| 国产精品污WWW一区二区三区|